Calculation Methodology & Physical Derivations
Estimate net cavity volume, linear joint run, waste allowance, and material packs. Illustrative yield only. Enter the yield and pack mass stated for your actual product. These estimates do not certify a mortar specification.
1. Cavity Volume Equation
For any direct joint cavity, base volume equals total joint length multiplied by visible joint face width multiplied by repointing fill depth.
2. Regular Masonry Module Derivation
In a running bond wall, the repeating module has dimensions (Lu + wj) by (Hu + wj). The continuous bed joint length is (Lu + wj) and the head joint is Hu. The sum (Lu + Hu + wj) divided by module area yields exact linear metres of joint per square metre without double-counting corner intersections.
3. Cited Technical Standards
Illustrative yield only. Enter the yield and pack mass stated for your actual product. These estimates do not certify a mortar specification.
- BS EN 771-1:2011 — Clay masonry units
- BS EN 771-3:2011 — Aggregate concrete masonry units
- BS EN 771-4:2011 — Autoclaved aerated concrete masonry units
- BS EN 998-2:2016 — Specification for mortar for masonry
- BS 3921 — Specification for clay bricks (historic imperial)
- BS EN 459-1 — Building lime definitions, specifications and conformity criteria
- SPAB Technical Q&A 24 — Repointing
- NPS Preservation Briefs 2 — Repointing Mortar Joints in Historic Masonry Buildings
- Historic England — Practical Building Conservation: Mortars, Renders & Plasters